High-Quality 16CAV Powder Flip Top Cap Mould With Hot Runner And Push Out

The High-Quality 16CAV D30MM Powder Flip Top Cap Mould is a unique and high-performance mold designed to produce high-quality and efficient powder flip top caps. Equipped with a hot runner system and a push-out mechanism, this mold can simultaneously produce up to 16 caps, significantly increasing production efficiency.

Constructed using a variety of high-quality mold steel options, such as P20, 50C, 420H, S136, 2083, 2344, DC53, and SKD61, the mold components are heat-treated to HRD 48-52 HRC for durability and reliability. Nitriding is also applied to all sliders and inserts, while Beryllium Copper is used in corners to enhance cooling efficiency.

With a production cycle of only 60 days, this mold has a lifespan of over 3 million shots, ensuring long-term productivity. We also provide wooden case packaging or customized packaging to ensure safe transportation.

CAP PRODUCT

introduction

1.Cavity: 16 cavities
2.Mold Material: We use a wide range of mold steel, including local and imported options such as P20, 50C, 420H (2083), S136, 2083, 2344, DC53, SKD61, and more. All components are with DME or HASCO standard, and we heat-treat them to HRD 48~52 HRC. We also nitride all sliders and inserts and use Beryllium Copper in corners to improve cooling.
Runner: We can make both cold runner molds and hot runner molds (using YUDO, Moldmaster, Husky, and DME systems).
3.Delivery time: Our standard delivery time is 70 days.
4.Mould life: Our molds have a life of over 3 million shots.
5.Injection cycle time: The injection cycle time is typically 15-18 seconds.
6.Package: We can package the molds in wooden cases or according to customer requirements.
7.Mould base: Our mould base is made of LKM frame and HASCO standard frame.
8.Mold drawing: We provide 2D mold drawing, 2D/3D cap drawing, and details layout.
9.Expertise: Our engineers and technicians are highly experienced and professional in mold making skills.
10.Plastic material: We have wide usage of plastic material and have developed ways to control the mold to produce 11.better parts for materials that may cause worse deformation, bad filling, or worse part surface.
12.Certification: We ensure mold life to customers and provide steel and material conformity certificates.
13.Lead time: Our advanced equipment and high-effective management enable us to give customers a stable lead time.

Address

21 Junfa 3rd Road, Dongkeng Town, Dongguan City, Guangdong Province, China

Email

Sales@blowmoldingyue.com

Phone/Whatsapp

+86 13528556448

Scroll to Top