16CAV Shampoo Flip Top Cap Mould With In Mould Closing (IMC), Hot Runner, And Push Out.

With 16 cavities, our mould enables simultaneous production of 16 shampoo flip top caps, boosting your production efficiency and output. The in-mould closing (IMC) feature allows for seamless integration of the cap and closure during the moulding process, ensuring a precise and secure fit. This results in a superior quality cap that enhances product integrity and user experience.
Equipped with a hot runner system, our mould ensures precise temperature control and efficient plastic flow, minimizing material waste and producing consistent, high-quality shampoo flip top caps. The hot runner technology enables optimal gating and eliminates the need for post-mould trimming, saving time and resources in the production process.
To further enhance efficiency, our mould incorporates a push out mechanism. This feature facilitates easy ejection of the finished caps from the mould, reducing downtime and streamlining your production workflow. You can expect smooth and efficient operation throughout the moulding process.
Crafted with precision and durability in mind, our shampoo flip top cap mould utilizes high-quality materials such as P20, 50C, 420H, S136, 2083, 2344, DC53, and SKD61 steel. These materials undergo meticulous heat treatment processes to ensure excellent hardness and long-lasting performance.

CAP PRODUCT

introduction

1.Cavity: 16 cavities
2.Mold Material: We use a wide range of mold steel, including local and imported options such as P20, 50C, 420H (2083), S136, 2083, 2344, DC53, SKD61, and more. All components are with DME or HASCO standard, and we heat-treat them to HRD 48~52 HRC. We also nitride all sliders and inserts and use Beryllium Copper in corners to improve cooling.
Runner: We can make both cold runner molds and hot runner molds (using YUDO, Moldmaster, Husky, and DME systems).
3.Delivery time: Our standard delivery time is 60 days.
4.Mould life: Our molds have a life of over 3 million shots.
5.Injection cycle time: The injection cycle time is typically 15-18 seconds.
6.Package: We can package the molds in wooden cases or according to customer requirements.
7.Mould base: Our mould base is made of LKM frame and HASCO standard frame.
8.Mold drawing: We provide 2D mold drawing, 2D/3D cap drawing, and details layout.
9.Expertise: Our engineers and technicians are highly experienced and professional in mold making skills.
10.Plastic material: We have wide usage of plastic material and have developed ways to control the mold to produce 11.better parts for materials that may cause worse deformation, bad filling, or worse part surface.
12.Certification: We ensure mold life to customers and provide steel and material conformity certificates.
13.Lead time: Our advanced equipment and high-effective management enable us to give customers a stable lead time.16

Address

21 Junfa 3rd Road, Dongkeng Town, Dongguan City, Guangdong Province, China

Email

Sales@blowmoldingyue.com

Phone/Whatsapp

+86 13528556448

Scroll to Top